Research laboratory facility
A multi-lab research building: every system coordinated in one model, from roof plant down to the lab benches, then shown to the client as a 4D construction sequence and a walkthrough film.

About the densest ceiling void you will see.
Laboratories carry some of the densest services of any building: high air-change ventilation, fume exhaust, lab service piping and fire protection, all competing for the same ceiling void. Every clash found on site means cutting out and redoing work.
The brief: one model in which every system passes the next with clearance, and that the client can understand without reading a drawing.
Drag to see the difference.
The coordinated model on one side, its linework as it appears in the drawing on the other.

ModelDrawing
What we delivered.
- Federated model of all disciplines
- Clash detection cycles across ductwork, piping, sprinklers and cable tray
- Roof plant and exhaust stack coordination
- 4D construction sequence
- Rendered walkthrough film for the client
Pick a system.
HVAC ductwork
Main supply and exhaust runs routed above every lab, with clear space kept for access and maintenance.
Piping systems
Pipe runs set at their own level, so they cross the ducts with clearance instead of through them.
Fire protection
Sprinkler mains and branches coordinated against ductwork, cable tray and lighting.
Roof plant and exhaust
Exhaust stacks and roof equipment modelled with their supports and service zones.
Cable tray
Containment routed in coordinated zones and drawn to fabrication level.
From the roof down to the rooms.







Shown without the client's name, out of respect for confidentiality.
Your project starts the same way.
Send us the drawings or scope and the developer's requirements. You get a technical and commercial proposal within 2 working days.