Stage 02

Tender on model quantities, not guesswork.

We turn the coordinated design into a clear tender package: drawings, specifications, quantities taken from the model and a 4D sequence, so every bidder prices the same project.

Coordinated model used for quantity take-off
For both sides of the tender

Whether you issue the tender or bid on it.

For developers and owners

A tender package that leaves no room for interpretation

  • Tender drawings coordinated and clash-checked before issue.
  • Bill of quantities taken from the model and linked to its elements.
  • A 4D sequence that shows bidders how the works are phased.
  • Support answering bidder queries and comparing bids on quantities.
For contractors

Price what you will actually build

  • Quantity take-off from the tender drawings or model within the bid period.
  • Constructability and clash-risk review of what could cost you later.
  • A 4D programme to attach to your technical submission.
  • Value-engineering options tested in the model.
Linework of the coordinated model
How we measure

Every number traces back to an element in the model.

  • Elements classified to Uniclass 2015 and quantities measured to NRM or CESMM, or whatever method the owner specifies.
  • Quantities are linked to model elements, so any design change updates them automatically.
  • We state the basis and exclusions of every quantity for the model's level of detail at that stage.
  • Earthworks, pavement layers, utility networks and planting are measured from the model too.
  • A risk register: what is not yet coordinated and could change the cost.
Next · Stage 03

LOD 400 shop drawings

LOD 400 models and shop drawings, matched to each developer's own requirements.

Go to the next stage
Questions we hear

Before you ask.

Not here? Send us your question and we will reply the same working day.

How accurate are model-based quantities?

As accurate as the model. At design stages we report quantities with their basis and exclusions; at LOD 400 they reflect what will actually be installed.

Do you price the works for us?

We give you structured, traceable quantities and risks; your estimators apply the rates.

Send the scope. Get a clear proposal.

Send us the drawings or scope and the developer's requirements. You get a technical and commercial proposal within 2 working days.

Request a proposal