Coordinated MEP model of a research laboratory in Riyadh: ductwork, piping and fire protection in every room
BIM-led engineering · from Egypt, for Saudi projects

Every element studied before it is built.

We design to the Saudi Building Code and international codes, prepare tender packages and produce LOD 400 shop drawings to each developer's requirements, so your project reaches site with its problems already solved in the model. One team and one model, from the first line to handover.

Move your pointer: the drawing becomes the model.

SBC 2024Saudi Building Code
LOD 400Shop drawings
ISO 19650Information management
All disciplinesBuildings & MEP · roads & utilities · landscape
Why it matters

What is solved in the model is never torn out on site.

We study the project down to its smallest element before it is built. That is the difference between a site that installs and a site that redoes.

Clashes solved on screen

Every crossing between duct, pipe, cable tray and structure is found and resolved in weekly coordination cycles, long before it reaches site.

Quantities you can trust

Quantities come from a coordinated, construction-level model, so they match what will actually be installed, not what was estimated on paper.

Built to pass first review

We read the requirements of the developer, the consultant and every approving authority, from Balady, the municipality and Civil Defense to the royal commissions and Sports Boulevard, before we draw.

Developer requirements

We work in the developer's language: their requirements, templates and standards.

Every developer in the Kingdom has its own digital delivery requirements: EIR, AIR, LOIN, MDS and CDE protocols. We open every project by turning them into a compliance matrix: every clause tied to a deliverable, a check and an owner.

Example compliance matrix
Developer requirementWhat we deliverHow we check
Exchange and asset information requirements (EIR · AIR)Pre- and post-appointment BEP, MIDP, TIDPs and RACI matrixReviewed with the appointing party before mobilisation
Level of information need and model development specification (LOIN · MDS)LOD and LOI for every element at every stage, classified to UniclassModel QA/QC checklist at every data drop
CDE protocols and namingWIP → Shared → Published in the owner's naming and suitability codesAutomated check at every issue
Review procedure and comment sheetsA response to every comment on the owner's sheet, under the agreed review codesWeekly report of open comments
Handover requirements and the AIMCOBie, asset tags and an asset information model ready for CAFMValidated before handover

Illustrative example. The actual clauses come from the developer's documents on each project.

The requirements and standards we work to
Real project

Step inside a model we coordinated.

A research laboratory facility in Riyadh. Pick a system to see how it passes the next one without touching it.

Aerial view of the coordinated laboratory model

HVAC ductwork

Main supply and exhaust runs routed above every lab, with clear space kept for access and maintenance.

Shots are from the live project model. The client is not named, out of respect for confidentiality.

Built by us

SafetyCheck: the fire and life safety requirements for any building, with reason and clause.

An app built by our team that checks a building against the Saudi Building Code 2024 and NFPA, shows every requirement with its reason and clause number, then builds the FLS report in Arabic or English. Try it on one of your own buildings, free.

The SafetyCheck results screen for an illustrative apartment block
Our commitments

Numbers, not adjectives.

We measure our work by what can be checked, and send you the numbers every week.

0

Hard clashes in any sheet we submit. The target of every coordination cycle.

1

Model carried from design through to handover.

400

Level of detail in our shop drawings: ready to fabricate and install.

2

Working days to a technical and commercial proposal.

Real models

Every image on this site comes from a project model we worked on.

Led by a certified engineer

A mechanical engineer certified PMP and CFPS who knows the site and the code, delivering BIM since 2016.

Close to your project

From Egypt: at most one hour's time difference from the Kingdom, and reports and meetings in Arabic and English with developer, consultant and contractor alike.

Questions we hear

Before you ask.

Not here? Send us your question and we will reply the same working day.

What does LOD 400 mean in practice?

Each element is modelled at its true size and position, with its connections, supports and the information needed to fabricate and install it. For MEP that includes hangers and supports, insulation, maintenance access zones and spool breaks. The resulting drawing can be fabricated and installed as drawn.

Do you work to the requirements of the Kingdom's major developers?

Yes. We answer each owner's exchange and asset information requirements (EIR, AIR) with a pre- and post-appointment BEP and an information delivery plan (MIDP, TIDPs), model to its LOIN and model development specification (MDS), work inside the CDE it specifies, and hand over the asset information model (AIM) in the format it asks for.

You are based in Egypt. How do you work on projects in the Kingdom?

We model, coordinate and produce drawings from Egypt, at most one hour's time difference from the Kingdom, working inside the project's common data environment in Arabic and English. Drawings that need a licensed engineering office in the Kingdom are reviewed, signed and submitted by the project's licensed office; we prepare them for it in full.

Do you design to the Saudi Building Code?

Yes. The design is checked against the Saudi Building Code parts that apply to the project, and against the international references the specification calls for, such as NFPA, ASHRAE and ACI, then prepared for the authority approvals the project needs, for the project's licensed engineering office to submit.

Is BIM mandatory in Saudi Arabia?

There is no blanket national mandate, and Balady permits do not require it. It is required on government projects through the EXPRO manual, and in giga-project contracts and developer requirements. Read the details and sources.

At what stage can we bring you in?

Any stage. Some clients start with shop drawings after award; others bring us in at concept design. The earlier we start, the more problems get solved in the model instead of on site.

Which software and platforms do you use?

Revit for building models, Civil 3D for roads and infrastructure, Navisworks for coordination and clash detection, Autodesk Construction Cloud as the common data environment, AutoCAD where drawings need it, and Dynamo and the Revit API for automation. We work inside the owner's environment: Autodesk Construction Cloud, Aconex or Revizto.

How quickly do you send a proposal?

Within 2 working days of receiving the scope and drawings. Large packages may need a short call first to understand the requirements.

How do you protect our project data?

We follow the security-minded approach of ISO 19650-5: project files stay inside the owner's CDE or environments it approves, with role-based access, and no data leaves without its approval. We sign an NDA on request, and never publish a client's name or images without written permission.

Send the scope. Get a clear proposal.

Send us the drawings or scope and the developer's requirements. You get a technical and commercial proposal within 2 working days.

Request a proposal