| Saudi Building Code (SBC), 2024 edition | Building design and construction requirements for every discipline; mandatory since 30 June 2025. | Design checked against the parts that apply to the project. |
| Balady permit (Ministry of Municipalities and Housing) | Building permits, automated design review where the municipality applies it, and the engineering-office guide's requirements: bills of quantities, specifications and calculations. | Permit sets, quantities and calculations from the same model, and models ready for automated review. |
| Civil Defense | Fire and life-safety requirements. Fire-protection drawings are submitted by an office accredited by Civil Defense. | Fire protection and means-of-escape design and drawings, coordinated with every other discipline and submitted through the accredited office. |
| Municipalities (Amanat): urban plan approvals | Approval of urban and subdivision plans, including completion of infrastructure, through municipal platforms such as Riyadh Municipality's. | The urban plan, roads and networks from the same model. |
| Utility providers | National Water Company, Saudi Electricity Company and telecom providers: connections, loads, substation rooms and telecom infrastructure. | Connection and load packages, coordinated with the networks and buildings. |
| Royal commissions and Riyadh's major projects | Royal Commission for Riyadh City: projects within its remit and its design guidelines. Diriyah Gate Development Authority, through its UMA sector: Concept and Detailed Design Certificates, the Construction Building Permit and the Occupancy Permit. Sports Boulevard requires design submissions as BIM models and offers a Revit 2023 template for its design code. | Models and packages in each authority's format and templates. |
| Saudi architectural design guidelines | Regional architectural guidelines that building permits must follow where they apply. | Massing and facade studies in the model, checked against the applicable guideline. |
| Government projects: National Manual for Projects Management (EXPRO) | Design from 3D models with a BIM execution plan, clashes closed within 10 business days, submittals at 30, 60 and 100%, and COBie data in IFC at handover. | Models, plans and handover set up to the manual from day one. |